Transportation · Transportation

Rail Transit and Tunnel Inspection

Ground solution for no-signal environments

Inside the tunnel, handheld 3D scanners paired with wheeled chassis collect data on lining surfaces and clearance limits. Along the track, small unmanned vehicles equipped with sensors conduct inspections by section.

IndustryTransportation
Product-related5product line
Deliverables5Item
Request Quote by Project
BackTransportationAll Solutions
Rail Transit and Tunnel Inspection

What's included in this plan?

The solution configuration maps to specific brands and product pages available on the site, with options to scale features up or down based on project size.

5{0} product lines /3Applicable use cases

Use Cases

Subway tunnelRailway subgradeUnderground Utility Tunnel

Deliverables

  • Scan Site DeploymentScanner Station Positioning, Spacing, and Target Deployment
  • Point Cloud Processing and OutputPoint Cloud Denoising, Registration, and Report Generation
  • Limit AnalysisTunnel Clearance Calculation and Oversize Determination Methods
  • Safety Briefing for WorkSafety Briefing Record for High-Altitude, Waterfront, and Roadway Occupation Operations
  • Deliverables and Retesting RecommendationsDeliverables Checklist and Follow-up Retesting Recommendations

From a single point to an entire area

Progress in four stages: on-site confirmation, list configuration, implementation integration, and training handover. Maintain records for each stage.

4implementation phase

STEP01

On-site Requirement Confirmation

Verify the locations and quantities of points in subway tunnels, railway embankments, underground utility corridors, etc., against existing system data.

STEP02

Inventory and Configuration

Output a table listing model numbers, quantities, installation locations, and interface mappings to clearly identify add-ons and optional configurations.

STEP03

Implementation and Integration

Complete installation, configuration, and system integration per the "Deliverables" section, retaining all debug logs.

STEP04

Training and Handover

On-site training and daily maintenance, including account handover, configuration documentation, and spare parts list.

TransportationRest of the industry2package

Other solutions within the same industry can be combined based on project scope.

BackTransportationIndustry Page

Need a cross-industry portfolio? ViewAll Solutionsor directlyContact Us。

Similar Project Cases

andTransportationView delivered projects in your industry, including on-site scenarios, equipment used, and implementation results.

View All Cases
Beijing ICP License No. 2026026760